BestsellerWinter

A lighter, smoother heated blanket.
4.1 · 9675 ratings on AmazonUltra-soft microplush with dual-zone controls and a 10-hour auto shut-off. Less lofty than sherpa — which many people prefer under a duvet.
Two controllers, two preferences.
Peace of mind overnight.
Detach the controller first.
| Size | 100 × 90 in |
|---|---|
| Thickness | 0.25 inches |
| Material | Fleece |
| Fill | Polyester |
| Care | Machine Wash |
| Options | 4 Color · 4 Size |
Ships from U.S. fulfillment centers, typically arriving in 2–5 business days. 30-day returns on unused items in original packaging.
Cushions, bean bags and pads arrive vacuum-compressed. Unpack, pat or knead for a couple of minutes, and allow 24–48 hours (48–72 for 32-inch rounds) to reach full loft.



